Migration & Performance Proof

Tomahawk: a rebuild, then eleven sites moved

This project was about replacing legacy drag with a faster, sharper platform — one that improved mobile experience, tightened performance, and gave Tomahawk a more credible digital front-end without bloated migration theatre.

11 sites consolidated onto one environment
Modern React/Next.js front end
Planned cutover, no rebuild required

What moved

Two pieces of work, done in sequence: a front-end rebuild, then a hosting migration off legacy infrastructure.

11 sites

Migrated off legacy hosting and consolidated onto a single managed environment.

Modern stack

Front end rebuilt on React and Next.js, replacing a build that made changes slow to ship.

Mobile-first

Interface restructured around phone browsing rather than desktop aesthetics.

Project overview

Tomahawk came in with a site that was slowing down both the user experience and the internal ability to improve it. Legacy technology, weak mobile behaviour, and poor performance were working against the brand.

We approached the job as a full platform reset: migrate to modern front-end tooling, reduce friction on mobile, and turn the site into a faster, more trustworthy asset that could support future growth.

A later phase moved the hosting itself. Eleven sites sitting on an ageing third-party environment were migrated onto a single managed server, planned as a staged cutover so the business kept control of DNS and could verify each site before it went live.

11
Sites Migrated
1
Consolidated Environment
Staged
Verified Cutover
Tomahawk Website Migration Project

Challenges removed

The old platform was costing the business speed, flexibility, and trust signal.

Outdated Technology Stack

The previous build made changes slow, maintenance heavier, and modern commercial improvements harder to ship with confidence.

Poor Mobile Experience

The mobile experience created friction for visitors, which weakened trust and caused too many users to leave before engaging.

Performance Issues

Slow loading times and weak Core Web Vitals reduced discoverability and dragged down the overall quality signal.

Solutions applied

Each move was aimed at making the site faster, cleaner, and easier to grow.

Modern Platform Migration

We rebuilt the site on a cleaner React/Next.js architecture so the business had a faster, more maintainable foundation.

Mobile-First Reframe

The new interface was structured around mobile browsing and quicker comprehension, not just desktop aesthetics.

Performance Upgrade

Image optimisation, code-splitting, and front-end cleanup pushed the experience closer to the premium standard the brand needed.

Technology stack

Modern tools selected for speed, maintainability, and better front-end control.

React

Frontend Library

Next.js

React Framework

Modern CSS

Styling

Performance Optimisation

Web Vitals

Responsive Design

Mobile-First

SEO Optimisation

Search Engine

Delivery timeline

Eight weeks from audit to launch.

Week 1

Discovery & Analysis

Audit of the existing site, pain points, and commercial requirements.

Week 2-3

Design & Planning

Migration strategy, visual direction, and UX hierarchy reset.

Week 4-6

Development & Migration

Full rebuild using modern tooling and responsive components.

Week 7

Testing & Optimisation

Performance tuning, bug fixes, and launch readiness checks.

Week 8

Launch & Support

Production rollout and post-launch monitoring.

Project results

The migration improved site quality and business outcomes at the same time.

What Changed Technically

Front endRebuilt on React / Next.js
DeliveryImage optimisation, code-splitting
LayoutMobile-first structure

Hosting Migration

Scope11 sites
DestinationOne managed environment
MethodStaged, verified cutover

Why Migrations Go Wrong

Moving a single site is routine. Moving eleven at once is a coordination problem: DNS, certificates, mail routing, and per-site configuration all have to line up, and a mistake on any one of them is visible to that site's customers immediately.

The approach was to stage everything on the new environment first, verify each site against the old one, and only then move DNS - so the business kept a working fallback at every step rather than betting on a single switch-over.

Planning a migration reset?

We can review the current stack, performance drag, and package fit before you commit to a rebuild.